EBC LogoEastern Building
Components, Inc.
Modified:  June 21, 2006

Roof Trusses
Floor Trusses
Wall Panels >
I-Joists

Manufactured Wall Panels

Ordering engineered prefabricated wall panels is the advantageous alternative to conventional on-site stick building, saving you labor, time, materials, money, and hassle.
With wall panels:

Roof Truss

  • Structures are dried-in more quickly, thus avoiding weather related delays
  • Less labor required, less cost to you
  • No guess work on job-site, because they're accurate and well-engineered
  • Less material shortage delays, because entire system is shipped in one package
  • Significantly reduce potential for job site theft.
  • Dramatically reduce cost of waste removal from job site.


Wall Panel Plant Walkthrough - See the process! Take a walk through the plant.

Wall Panels versus Stick Framing
Framing the American Dream
What was learned about wall framing? Savings by Components
66.5 man-hours!
That's almost a 75% reduction in your cost of labor!
Components
26.5 man-hours
Stick-Framing
93 man-hours
All above information and images pertaining to Framing the American Dream are ©WTCA.
© 2006 Eastern Building Components